Floor repair
Purchase value
$45
Standard Guardrail
Metal

Ennat
$1.060
Repair or replace cost caused by an impact incident:
$0
$15
$18
$75
$1.293
$153
Due to ENNAT’s impact absorption technology, force is dissipated at the base rather than transmitted to anchors and surrounding infrastructure. For modeling purposes, residual impact-related costs are calculated using a conservative engineering assumption, reflecting significantly reduced structural, slab, and equipment damage compared to rigid alternatives.
$262
$2.217
Protection repair/ replace
Infrastructure repair/ replace
Labor downtime
Forklift damage
Total Cost per Incident
One impact incident every
Total yearly repair cost
Operational disruption generated by restricted access, safety isolation areas, or repair interventions following an impact event.
Estimated cost of repairing adjacent structural elements affected by the impact, such as racks, columns, panels, automation systems, or protective structures connected to the impact zone.
Cost associated with concrete slab damage resulting from impact force transmission through anchors into the floor. Includes cracking, spalling, anchor pull-out, and localized slab degradation.
Estimated annual cost generated by repeated impact incidents, calculated based on incident frequency and total cost per incident
Average frequency of impact events affecting this protection system. Adjust this value to match your facility’s traffic intensity and operational conditions.
Aggregated technical cost generated by a single impact event, including structural, infrastructure, slab, equipment, and operational effects.
Estimated cost of mechanical or structural damage to the forklift resulting from impact energy absorption or force rebound.
For ENNAT systems, this value is shown as $0 due to ENNAT’s Durability Warranty. Under the Reliability Promise, damaged ENNAT-manufactured components are replaced at no cost during the coverage period, eliminating protection replacement expenses after impact events.
Cost to repair or replace the damaged protection structure after an impact. Includes material replacement, structural components, and potential anchor reinstallation.
1.671 %
5-YEAR ROI
Five-year return on invested capital, reflecting the financial performance generated by the capital allocated to this protection system. This metric evaluates long-term value creation and capital efficiency.
$8.605
5-YEAR SAVINGS (NET OF INVESTMENT)
Projected net financial benefit over five years compared to the alternative solution, after deducting the initial capital investment in ENNAT protection.
3 months
PAYBACK PERIOD
Estimated time required to recover the initial investment through operational savings and reduced impact-related expenses.


Edit the information below to adjust the calculation.
5 Year Cost Overview
All values used in this calculation must be adjusted to reflect the specific operational and financial conditions of each facility.
The model is based on operational statistics accumulated by ENNAT through years of industrial project experience and reflects typical impact frequency and repair cost patterns observed in real installations.
Results are estimates only. Actual savings and return on investment may vary depending on site conditions and operational practices. This analysis does not constitute a financial guarantee.